Industries We Serve: Construction & Excavation
Idle Equipment
Burns Daylight.
Off-road diesel, DEF, and on-site storage delivered to your job site, with after-hours fills that have your machines ready before the crew clocks in.
For construction & excavation
Fuel That Follows the Job
Job sites move. Equipment can't sit waiting on a fuel run. We deliver to wherever your machines are staged, on the schedule the project demands.
Dyed & clear, one delivery
Off-Road Diesel
Dyed off-road diesel for excavators, dozers, loaders, and cranes, plus on-road diesel for your haul trucks, all from one delivery. The fuel that keeps the iron in the cut.
Wet hosing
Mobile Fueling
Mobile units fuel each machine directly, no operator drives to a pump, no equipment leaves the dirt. Day, night, or before first shift.
Job-Site Tanks
Temporary above-ground storage with secondary containment, refilled on schedule.
DEF Supply
ISO 22241 DEF delivered with your diesel to keep Tier 4 machines compliant, no run-dry derate.
Built around the build
Fuel Logistics That Match Your Timeline
A fuel run that pulls an operator off a machine for an hour is an hour you can't bill. We plan around your project so the equipment stays in the cut and the schedule stays on track.
- Multi-site coordination: one account across every job you're running
- Move-in / move-out service: tanks set and pulled as the project phases
- Cost-coded billing: fuel allocated by site for clean job costing
- IronGuard™ diesel: additive-treated for cold starts and fewer breakdowns
From mobilization to move-out
Fuel That Phases With the Job
We set up when the site breaks ground and adjust as the work moves, so you never pay for fuel infrastructure you have outgrown, or run short on the infrastructure you need.
Mobilize
We set above-ground storage with secondary containment at your site, sized to the phase you are in and in place before the first machine needs fuel.
Keep It Fueled
Scheduled and mobile fills follow your shift calendar, including after-hours, so machines are topped and ready at first light, fuel cost-coded by site for clean job costing.
Move Out
As phases close, we pull or relocate tanks to your next site, one account follows the work from job to job, so changeover is a phone call, not a new contract.
The difference
Why Contractors Switch to Us
Job sites move, and a supplier who cannot move with them costs you a morning.
| What you get | 1st Choice | Card-lock / national |
|---|---|---|
| Fuel comes to the machine | You haul to a pump | |
| After-hours & weekend fills | Business hours | |
| Job-site tanks | You arrange it | |
| One account across all sites | Per-site setup | |
| Ohio-based dispatch | Regional call center |
How we deliver
The Programs Behind Your Supply
Your sites are served by the delivery and compliance programs that run across our commercial operation.
Why contractors choose us
Built for the Job Site
Downtime Has a Number
Every hour a machine sits is rented iron not earning. We keep the tanks full and the equipment moving so your schedule and your margins hold.
Compliance Built In
Secondary containment and DOT-certified drivers come standard, so an inspection or audit is a non-event, not a scramble.
One Call, Every Site
A named account contact who knows your projects coordinates fuel across all of them, new sites added with a phone call, not a new contract.
"They set tanks at three of our sites and keep them full without us thinking about it. The equipment is always ready at 6 a.m."
Jim W.
Site Superintendent, Northwest Ohio Earthworks
Talk to a specialist
Fuel Your Next Job
Tell us about your sites and equipment. We will follow up with a delivery and tank plan, usually within one business day.